Specifications include, but are not limited to: 1. Salvage existing chainlink fencing and provide temporary security fencing around the limits of disturbance. Install sediment control fencing. 2. Sawcut, remove and stockpile existing asphalt pavement 3. Excavate for infiltration basin and provide woven geotextile fabric in the bottom. Construct earthen berm. 4. Construct concrete curb and gutter and provide tapered curb cuts. Construct concrete rip rap on transition from curb to earthen berm. 5. Fill in bottom of infiltration basin and on top of the geotextile fabric with clean well sorted 3” to 5” stone 6. Wrap the placed stone in woven geotextile fabric and backfill on top of the fabric with sand layer and top soil layer 7. Block sod on top of top soil layer and spray cellulose fiber much seeding on slopes of infiltration basin.