All correspondence must be made through the Vendor Portal. Specifications include, but are not limited to: This project includes, but is not limited to, replacement of the Peak Flow Basin C concrete liner including demolition, excavation and haul-off, construction of underdrain improvements, basin access road improvements, plugging of the Basin C to A.1 interconnect and all associated improvements. The project also includes installation of scum baffle at Peak Flow Basin B.2 to C spillway, partial or complete removal of the mitigation cell, installation of one new 62 MGD vertical turbine solids handling pump, replacement of the existing influent pump station non-potable water booster pump station seal water piping and associated piping/electrical/instrumentation improvements for the existing six VTSH pumps, construction of slope improvements at the stormwater pond and site drainage channel, removal/demolition of the existing sluice gate/temporary bulkhead plate at Gate Structure No. 2 and replacement with new slide gate and actuator.