Specifications include, but are not limited to: The scope of this project is the construction of new wastewaterutilities within the Crestwood residential development. The major work in this project shall generally consist of but is not limited to the construction of one 5 Hp duplex submersible lift station with valve vault and odor control drum scrubber, electrical, controls and instrumentation. Also, the project includes approximately 2,255 SY of street improvements including reconstruction, milling and overlaying, approximately 2,293 LF of 8” PVC gravity sewer wastewater main, 19 concrete manholes, approximately 2025 LF of4” and 1080 LF of 6” PVC wastewater residential service gravitylines, service connections, pavement repair, landscape restoration, site protection and grading, traffic control and all miscellaneous and incidental work required to complete the project as shown on the project drawings and as specified. Bid Alternate #2 is for the McCloney Sanitary Sewer Project and includes approximately 780 LF of 8” and 15” PVC pipeline, 4 concrete manholes, 1 7’x7’ storm conflict manhole, and surface replacement.