Specifications include, but are not limited to: find the apparent best method to convey 150 MGD of raw water from the IPL drop-off location to the Bachman Water Treatment Plant, to propose and evaluate alternatives for feasibility, constructability, acceptability for purpose. Additionally, for each alternative an opinion of probable cost and schedule along with a list of advantages and disadvantages shall be produced. The Consultant shall rank, based on engineering principles and agreed upon weighting criteria, each of the alternatives and make a recommendation as to the apparent best alternative. The Consultant shall present the results and recommendations of the study to Dallas Water Utilities Staff, Dallas Water Utilities Executives, and the City of Dallas Executive Team as required. All tasks shall be completed in 12 months