Specifications include, but are not limited to: Project scope includes all labor, equipment, tools, materials, and incidentals necessary, but not limited to complete the removal and replacement of geomembrane liners in forty-two (42) ponds and kettle rehabilitation as shown on the Contract Documents. The pond liners and kettles at Possum Kingdom Fish Hatchery are in disrepair and require replacement and rehabilitation. This project will include: - Removal and replacement geomembrane liners in 42 ponds. - Install concrete curb around 42 existing kettles. - Perform concrete kettle rehabilitation. The pond renovations will allow the hatchery to have better control over pond leakage and reduce staff maintenance as the existing kettles and liner constantly require attention.