Specifications include, but are not limited to: 1. Preliminary Phase Services •Prepare an alignment evaluation and establish easement needs. •Develop a Preliminary Engineering Report (PER) o PER shall also meet the requirements of an Engineering Feasibility Report (EFR) to be submitted separately to TWDB for review. •Develop an Environmental Information Document (EID) in compliance with TWDB’s guidance document, TWDB-0801. •Note: During the alignment evaluation, the capacity and size of the interceptor will be evaluated and confirmed as part of a capacity evaluation associated with the Wilbarger Creek Regional Wastewater Treatment Plant project. 2. Design Phase Services (including Permitting) •Prepare project manual, drawings, and engineer’s opinion of probable construction costs based on the PER recommendations which comply with applicable Federal, state, local regulations and Pflugerville’s standards. •Engineering documents shall be delivered for City review and comment at the 30%, 60%, 90%, and 100% unsealed stages of completion. Complete and detailed engineering documents are required for the bidding and construction of the proposed improvements. Final engineering construction documents shall include topographic and boundary surveys where required, geotechnical investigation, environmental assessment and environmental clearances, identification of utility conflicts, required utility adjustments and replacements, coordination with utility companies, and determination of ROW/easement acquisition metes and bounds and sketch. •Right of Way acquisition and appraisal services for right-of entry, permanent easements and temporary construction easements as needed for the proposed project. 3. Bid and Construction Phase Services •Respond to questions during advertisement and prepare required addenda during bid. •Assist in evaluating bids, tabulating bids, and making recommendations for contract award. •Prepare conformed project manual and drawings per addenda. •Review and respond to shop drawings, submittals, requests for information (RFIs), change order proposals, and all other construction items. •Conduct specialty site visits as necessary to ensure general construction conformance with the contract documents. •Assist in final construction walk through and punch list. •Prepare record drawings per contractor’s redlines. •Provide warranty phase services.