Specifications include, but are not limited to: The rehabilitation of the City’s Water Treatment Plant is located on the east side of FM 365, approximately two miles south of US Highway 90. The WTP is bound by FM 365 (to the west) and the Lower Neches Valley Authority canal (to the south). The scope of work includes, but is not limited to, removal of debris from the filter backwash waste pond, excavation and capping of existing drain pipes from backwash pond and back filling hole, removal of debris and replacing of the damaged fence around WTP, replacement of air scour blowers used in the filter backwash process, relocation of turbidity meters and sensors, replacement of washed-out walkway and parking area, replacement of soil under concrete slabs due to washouts, removal of debris from the intake from LNVA to the WTP, removal of debris from holding ponds, stabilization of damaged berms, furnish and install concrete lab control building, replacement of sump pump in the filter gallery, and other appurtenances, as necessary.