Specifications include, but are not limited to: The construction of office space inside of a warehouse. The City’s Central Warehouse offices had to be demolished years ago and need to be reconstructed inside the warehouse. The warehouse offices had to be deconstructed due to some roof leaks in the warehouse roof that damaged the finishes of the offices. The offices are still framed out; however, some of the wood framing has rotted due to water exposure and will need to be replaced. The warehouse roof has been replaced recently and therefore there is no longer any exposure to outside elements that created the earlier problems. This project will be to rebuild these offices as they were with some minor changes in the footprint of the space and a possible addition of a conference/break room.