Specifications include, but are not limited to: Reconstruction of existing asphalt and concrete curb and gutter streets and parking lot to include approximately 65 square yards of 8" concrete paving with lime/cement stabilization, approximately 5,596 square yards of 6" concrete paving with lime/cement stabilization, 3,918 square yards of 5" concrete paving with lime/cement stabilization, 1,253 square yards of sidewalk paving; 2,397 linear feet of 8" wastewater mains, 387 linear feet of 6" wastewater services, 701 linear feet of 4" wastewater services, manholes, and appurtenances; 450 linear feet of 4" water main and appurtenances; 104 linear feet of 4'x2' reinforced concrete box culvert, 54 linear feet of 27" storm sewer, 308 linear feet of 21" storm sewer, 138 linear feet of 18" storm sewer, 104 linear feet of 10" storm drain, 44 linear feet of 8" storm drain, inlets, headwalls, and appurtenances; striping; concrete wheel stops; signage; and lighting along with other incidentals.