Specifications include, but are not limited to: PART ONE: Collaborate with TFC and its Architects and Engineers (A/E), MEP Engineering, Inc., during the completion of construction documents including Schematic Design, Design Development, 65% Construction Documents, 90% Construction Documents review and comments at 100% completion of Construction Documents. The Respondent’s expertise will be used to affect value engineering, establish a project schedule and ultimately determine the Guaranteed Maximum Price (GMP). The services include attending meetings, consultation of plan reviews, constructability reviews, and cost estimating. PART TWO: In accordance with the approved schedule and GMP, Contractor shall facilitate bidding and selection of subcontractors in accordance with HUB requirements, and provide and/or secure and install all materials, labor, coordination, management and supervisory activities necessary to complete construction of the Project in accordance with the drawings, specifications and other contract documents that will be prepared by the A/E & TFC.