Specifications include, but are not limited to: 1.2 Removal of Existing Canopies Contractor must notify El Metro, Anett Gomez, Maintenance Project Supervisor 24 hours prior to removing existing canopies. This will allow El Metro staff to remove any trash receptacles or map holders prior to the removal of canopies. 1.3 Sunshade Fabric The sunshade fabric must be COOLAROO w/EL Metro Logo (sew in), (equal or better in quality), for exterior extreme hot weather conditions and warrantied for a minimum of 5 years w/ ¼” cable & hardware. 1.4 Framework Must follow detail provided in the chart below as far as type, dimensions of the metal structure, bolt size, bolt- hole size, anchor bolt size, plates w/anchor bolts. Frame must be sanded, primed, and painted with NEW COLOR PAINT, (Color: Sherwin-Williams 5514 247-E). NOTE: Frame must be installed and leveled on the concrete pad. Finished product must be easy to assemble and disassemble. 1.5 Concrete The concrete must be minimum 3,000 PSI reinforced with 6”x6”x6” wire mesh w/specific beam dimensions & rebar to connect the slab with the column plates.