Specifications include, but are not limited to: A. The Contractor shall remove, replace, and dispose/recycle batteries in a designated area. B. The Contractor shall provide battery removal and disposal to an EPA approved facility, with all tracking documentation. C. The Contractor shall provide a battery monitoring system – detailed report of service activities completed during the battery replacement visit, to include request for maintenance number (RFM) and unit number. D. The Contractor shall test CCA (cold crank amp) with CCFD test equipment and batteries must test to specified cold cranking amps, with no exceptions. E. Stock should be rotated a minimum of every three months or when batteries do not test to specifications. F. The Contractor shall provide battery replacement services on a per battery basis. G. The Contractor shall keep batteries in an environment that adheres to manufacturer defined specifications.