Specifications include, but are not limited to: Interior Improvements: Interior improvements include new ceilings, new LED lighting, new doors and door hardware, new flooring, new finishes and new window shades in the areas of renovation. New lab casework will be provided in the science lab, and a new circulation desk and shelving will be provided for the library. The existing band hall will be modified to include new storage rooms and an office. Lockers in the school corridors will be replaced with new display cases. Drinking fountains in the corridors will be replaced with new ADA-compliant models. Reconfiguration of the existing fire sprinkler system, HVAC system and electrical system will also be required. Work specific to the auditorium area includes the refinishing of existing auditorium seats and a new control booth. A new sound system and video projection system will be installed. Upgrades to the theatrical lighting system, theatrical curtains and theatrical rigging are also included in the project scope. Exterior Improvements: Exterior work includes the replacement of the existing aluminum and glass entry doors and frames, the replacement of exterior sealant at existing curtain walls, and the replacement of roofing throughout the entire school. The scope also includes the replacement of several roof-mounted AHUs and the installation of a new sound isolation curb at the existing band hall AHU. Site upgrades include new paving for ADA compliance, the addition of a new fire lane, new parking spaces and site lighting on the South side of the school, installation of a new water main loop, repair of the existing grease trap, landscape and irrigation modifications, and a new deck and roof canopy for an outdoor kiln space.