Specifications include, but are not limited to: Repair and installation of gym walls and gym padding as well as repairs to exterior façade of the facility at the Boys & Girls Clubs of Edinburg RGV. Repairs and padding installation must meet the requirements as indicated or comparable equivalent to the specifications listed below: 1. Replacing of Interior Gym walls in two (2) (North & South) gyms as follows: Replace complete east and west walls (corner to corner) in two gyms from ground up to 16 feet with USG Sheetrock Brand Mold Tough VHI Firecode X Panels. Tape, float and paint entire walls that include new USG Sheetrock installation or that involve repairs. Replacement and installation of Gym Padding using Wainscot Wall Padding Guardian 2” (two inch) 2x6ft (two by six feet) panels of wall Protective padding on East and West Walls of North Gym and East and West walls of south gym for complete court coverage. The color selection will be approved by the Boys & Girls Club and must include the B&G Club Logo. Installation of Wainscot padding around all I-beams in North & South gyms and column padding around all columns in North & South gyms using approved 2" thick crosslink polyethylene foam core padding. The color selection will be approved by the Boys & Girls Club. 2. Repair and paint the exterior façade of the facility on gym exterior and main building as follows: EIFS repairing to all damaged areas of exterior walls of gym and cafeteria area. (see attached photos) that include labor and material to add high-impact mesh with new basecoat and finish coat (color to match to existing color). Areas repaired will begin with EFIS replacement at base and completed to the nearest horizontal joint above where damages are located. Work to be completed on Main building: North, West, and South walls and on East Wall of Rear Building. Caulking of base area to be completed after repair.