Specifications include, but are not limited to: This work consists of the turnkey assembly and installation of remote and keypad access gates for vehicles and pedestrians. Furnish all labor, materials and equipment for the complete installation as shown in the plans and specifications provided herein; to be installed at the Westway Apartments, as referenced on the drawings, to include but not limited to the following: 1. Contractor will furnish all labor, materials equipment, services, testing, transportation, insurance and daily expenses to meet the requirements of this Scope of Work, specifications and plans. 2. Locations provided on site maps are conceptual only. The final placement of locations is to be approved by the Opportunity Home SA Project Manager. The preferred outcome will enhance safety and security for residents. 3. Contractor will be responsible for providing electrical service to gate post bases, from the nearest building to that location. 4. Contractor shall install 7 concrete pads for gate opperators. 5. Contractor shall install gates at 4 vehicle entries, 3 are swing and the one by the main office is a slide gate, all are to be remote access. 6. Contractor shall install 4 pedestrian gates with self-closing hardware and access control panel. a. Each pedestrian gate shall have screening (expanded metal) installed on inside of gate, and on latch side of the fence to prevent persons from opening gate from outside. b. Pedestrian gates should not require power. 7. Existing gate leading to bus stop on Culebra road will need keypad lock and expanded metal installed to match the new gates 8. Contractor shall provide vandal and tamper resistant hardware and material where able. 9. Contractor will assist training Opportunity Home personnel on how to make changes to all keypad and remote control access points for adding, deleting, and reports, if available.