Specifications include, but are not limited to: 1.2.1 The work includes, but is not limited to, leveling course if directed; asphaltic pavement overlay of approximately 2 inches of hot mix asphaltic, reclaimed asphalt pavement (RAP), concrete pavement; accessible ramps; pavement marking; and a variety of miscellaneous work, as needed or as directed by the Streets and Drainage Division (SDD) project manager. 1.2.1.1 The Contractor shall be required to lay down two inches (2”) of hot asphaltic mix. The Contractor shall also be required to mill down to the original concrete street level on concrete streets and within a half inch, to one inch (½” – 1”), on open ditch streets. 1.2.2 Curb ramps along intersections of roads/streets to be overlaid shall be evaluated for compliance with the Americans with Disabilities Act (ADA) standards. Ramps must be compliant with the Federal Regulations for ADA Standards for Accessible Design, 28 CFR 36, revised September 15, 2010. If the evaluated ramps do not meet these standards, the Contractor shall be required to upgrade or replace them. Speed humps will be replaced only as directed by SDD Project Manager.