Specifications include, but are not limited to: ROOM 100J: 1. Remove existing door and jamb. 2. Install new door, jamb, and hardware according to plans. ROOM 101: 1. Demolish and relocate cased opening into Rm. 112 as shown on plans. 2. Remove all existing base board, ceiling tile, grid, and light fixtures. Flooring to be abated by others. Save and clean all HVAC registers for reinstallation. 3. Remove existing door and jamb. 4. Install new door, jamb, and hardware according to plans. 5. Knock down existing wall texture. 6. Skim coat and retexture walls to smooth texture finish. 7. Paint all walls and trim with Sherwin Williams Promar 200, walls to be satin and trim to be semi-gloss. Color to be determined later. 8. Install new 2x2 ceiling grid and tile. Return HVAC registers to original locations. ROOM 101A: 1. Remove existing entry door and jamb. 2. Install new entry door, jamb, and hardware according to plans. 3. Remove existing double doors near entrance. Repair and restore trim to a smooth, uniform appearance. 4. Replace three (3) existing light fixtures with new 3-lamp, 2’x4’ static lensed troffer, electronic ballast light fixtures with 15W LED T8 5K ballasted bulbs. New light fixture nearest building entrance to have emergency ballast with battery backup.