Specifications include, but are not limited to: The City of Galveston requests qualifications for professional engineering services to complete the design and perform construction administration of the 15th Street Drainage Area Storm-water pump station and associated infrastructure. The selected firms must demonstrate that they are qualified, capable, and competent to provide the following services: Preparation of project Gantt Chart documenting the planned schedule from design through construction; Preliminary statement of probable cost to be refined during the design process; Provide surveying, to include topographic, utilities, boundary, and Finished Floor Elevations (FFE); Provide Geotechnical Engineering Report; Provide Hydraulics and Hydrology (H&H) Modeling, and subsequent updates to the City’s Master Drainage Plan; Provide engineering design services for preparation of pump station and associated infrastructure from preliminary through final construction plans; Coordination with and secure required approvals with local, state, and federal agencies, and other stakeholders, as required; and Provide construction management services to the City as-built record drawings in AutoCAD, GIS Shape Files and PDF formats.