TC100 For mobilization and move in for construction (maximum of five percent of subtotal bid) all according to the specifications for the LUMP SUM of ________________________________ _________________________________________________________________ dollars and _____________________________________________________________________ cents. LS 2 TC101 For all grading, temporary paving, matting, and any other measures necessary for construction access including removal and restoration of the site, all in accordance with the plans and specifications for the LUMP SUM of ____________________________________________ _________________________________________________________________ dollars and _____________________________________________________________________ cents. LS 1 TC102 For all erosion control activities including installation and removal of physical measures, housekeeping practices, stabilized construction entrances, stabilization of all areas disturbed by construction activities, and all incidentals necessary to provide complete erosion control for the LUMP SUM of __________________________________________________________________ dollars and _____________________________________________________________________ cents. LS 1 TC103 For all barricading, traffic control, and traffic safety measures during construction in accordance with the Manual of Uniform Traffic Control Devices (MUTCD) and applicable City of Garland requirements including preparation of Traffic Control Plans, right-of-way work permits, guards, protective devices, signage, and all incidentals necessary in accordance with the project specifications, for the LUMP SUM of __________________________________________________________________ dollars and ________________________________________________________________ cents. LS 1