The Scope of Work for the Waste Water Treatment Plant includes the construction and installation of the 0.03 MGD concrete conventional activated sludge wastewater treatment plant including but not limited to: influent lift station, an influent splitter box with manual bar screen (headworks), aeration basins with coarse bubble diffusion system, circular secondary clarifier, cloth media disk filter, chlorine contact basin with sodium hypochlorite dosing system, aerobic digester with coarse bubble diffusion system, blowers, a non-potable water system for the WWTP, a reclaimed water wet well and effluent submersible pump station, a reclaimed water ground storage tank, a reclaimed water booster pump station for landscape and sports complex irrigation, a fire protection ground storage tank, a fire protection pump station, emergency generator, all electrical, site work, and yard piping necessary.