The City of Plano is soliciting bids for this project it includes the removal and replacement of approximately 11,890 linear feet of 6” and 8” waterlines, associated concrete pavement replacement, and barrier free ramps along the following streets: Angelina Drive between Los Rios Blvd and Donna Drive (Approx. 983 LF), Phyllis Lane between Diane Drive and Donna Drive (Approx. 883 LF), Diane Drive between Driftwood Drive and Angelina Drive (Approx. 890 LF), Donna Drive between Angelina Drive and Lottie Lane (Approx. 683 LF), Lottie Lane between Diane Drive and Country Club Drive (Approx. 1,130 LF), Country Club Drive between Los Robles Drive and E. Park Blvd (Approx. 2,635 LF), Amy Lane between E. Park Blvd and Molly Lane (Approx. 1,016 LF), Susan Circle (Approx. 390 LF), Molly Lane between E. Park Blvd to Amy Lane (Approx. 821 LF), Alley between E. Park Blvd and Angelina Drive (Approx. 366), Los Rios Blvd between Angelina Drive and Los Robles Drive (Approx. 1,154) and Driftwood Drive between Diane Drive and Country Club Drive (Approx. 939 LF).