Specifications include, but are not limited to: provide high speed leased lit fiber and a dark fiber solution connecting the District’s NOC located at 635 Rayburn, SAT, 78221 to all District facilities and schools, with GigE service or better via unshared dedicated fiber pairs. Bidder can provide a Hub and Spoke and/or a Ring Topology solution that terminates at 635 Rayburn, SAT, 78221. There will be NO oversubscription of the bandwidth at any point in the WAN. The WAN solution will provide a minimum of 10 Gig with the ability to upgrade to 40 Gigs during the contract term. WAN Services will include 28 point to point circuits providing Gig E lit and/or dark leased services over a fiber optic WAN. Each location is connected point to point back to the HUB location located at: Network Core Site – Data Center Information Services 635 Rayburn, San Antonio, Texas 78221 (210) 989-5120 Requirements include: • Single-mode fiber that meets or exceeds Corning SMF-28 qualifications, and ITU G.652 compliance between 1300-1550 nanometers. • Include 8 strands between McCollum High School (500 W. Formosa) and the NOC (635 Rayburn, San Antonio, Texas 78251). • Include 8 strands between 632 W. Vestal Place and NOC (635 Rayburn, SAT, 78221) • Winning bidder will test each splice upon completion to ensure <.20dbm or loss. • Harlandale Control IP routing of our own network • Guaranteed Priority One E-Rate compliant networks • All connections between locations WILL be provided over dedicated fiber and will NOT be delivered using any electronics that service other customers • The design and final delivery of services will NOT utilize any oversubscription. • Any future electronics needed to upgrade to a higher-level service will be delivered at your documented cost.