The winning Contractor[s] of this bid would be required to complete the following tasks and maintain the following responsibilities: Provide Construction Services to GP&L— within the entire footprint to include but not limited to the following counties: Dallas, Collin, Denton, Tarrant, Kaufman, Hunt, Robertson, Brazos, Grimes, Madison Pecos, Upton, Crane, Crockett, Ector Rusk, Panola To include Substation, Transmission Line, and Civil and Sitework. Non-emergency work must be able to be mobilized to any site in GP&L’s footprint within a 48 hour window from GP&L Notification. Emergency work must be able to be mobilized of labor and equipment for system failure shall be withing four (4) hours of notification. While following all Technical Specifications and General Requirements. While following quoted Bid Units Time and Equipment Rates Other Units provided in the Bid The winning Contractor is expected to provide full time use of the following Load Base Crews: Substation Load Base Crew This crew shall be “Turn Key” to complete any tasks and jobs related to a Substation: Above grade and below grade. Bus, Jumpers, DMC Compression, Grounding, Foundations, Conduit, Cable Pulling and terminating, Cable Trench Installation, Apparatus and Equipment Installation, Erecting Steel Structures, Testing of the Ground Grid and any other test required for materials such concrete test and meger control cables, Spreading and Rolling Top Rock, Offloading Material and Equipment from Delivery Trucks, Any and all tasks that can be performed in a sub station. This Load Base Crew shall be listed in the Bid Units as an hourly rate that that includes all of the following personnel and equipment. GP&L shall have the ability to use this dedicated crew year long if requested of the Contractor. This crew shall include the following: Personnel: General Foreman Working Foreman 5x Hands At least one of the hands must be a certified crane operator At least one of the other four hands must be a certified signaler/spotter. Equipment *Any equipment needed per task/job basis shall use the rate sheet