The project will entail the removal and reconstruction of the storm sewer system, residential street paving, and water line replacement. The scope of work for the storm sewer system consists of the removal of 12-inch to 48-inch storm sewer and realignment of the proposed 18-inch to 48- inch RCP storm sewer by open cut within the subdivision. The outer southwestern portion of the subdivision will consist of 1,075 linear feet of proposed triple 60-inch aluminized CMP. The project also includes reconstruction of approximately 450-feet of 40-foot wide 7-inch concrete pavement, 1.2 miles of 28-foot wide 6-inch concrete pavement, 100-feet of 28-foot wide asphalt pavement, including 1,075 linear feet of ditch regrading, 2.3 miles of 5-foot sidewalk and reconstruction of concrete driveways. The proposed water line rehabilitation includes trenchless construction of the 4-inch to 8-inch water line. Additionally, the project requirements include traffic control, miscellaneous signage, SWPPP measures, tree protection plan and other items, to facilitate construction of this project.