The City of Waco has issued this solicitation for the Speegleville Regional Detention Improvements. The project shall generally consist of but is not limited to all labor, materials, equipment, appurtenances and incidentals as required to properly install, complete and be accepted in place an approximately 37,000 cubic yard regional detention pond and outfall weir structure, approximately 3,100 linear feet of drainage channel, approximately 600 linear feet of culverts and storm drain pipe, 2,000 linear feet of gravity wastewater line, 13 new manholes of various size and material, temporary by-pass system, abandonment of existing wastewater lines, approximately 1,000 linear feet of water line, surface replacement, road repair and all necessary components as shown on the project drawings and as specified herein.