The Work shall include furnishing all tools, labor, materials, equipment, and miscellaneous items necessary for the complete construction of approximately 620 linear feet of concrete shared-use-path, 400 linear feet of sidewalk improvements, 200 linear feet of bike lane improvements, two proposed concrete medians, realigned crosswalk striping on all four sides, 635 linear feet retaining walls, 18 linear feet culvert extension on the bridge, 120 linear feet proposed storm sewer improvements, 40 linear feet 8-inch WWL relocation, and two large diameter empty steel casings for potential future Austin Water Utility (AWU) replacements at the intersection of Shoal Creek Boulevard and FM 2222 (Northland Drive). The work also includes illumination, signing and striping for the trail.