Specifications include, but are not limited to:The Lockhart School District needs to replace the existing analog security camera system at Lockhart High School and the need to purchase a new security camera system for Alma Brewer Strawn Elementary School. The Lockhart School District would include a new security access control system. The general contractor for the renovation of the High School and the building of the new elementary has provided the installation of a data cable from the data closet to each location (Security Camera & Door Access Control). There will be a need of additional data cables to be installed by the proposer. The contractor has supplied the access control hardware for each new door. This includes the card reader, wiring and the contact for each door. LISD would need for the proposer to install the hardware and provide the access control system application with a controller and any other hardware to complete the installation of the door access control system for each door. For the High School a phased approach will be taken since the district is renovating multiple buildings. Phase 1 will include the installation of 63 Interior Cameras to be installed - C 01-63 and 24 Exterior Cameras to be installed – Ext 01-24. Phase 2 will include the installation of 27 Interior Cameras to be installed – C 64-89 and 7 Exterior Cameras to be installed – Ext 25-31