This project consists of approximately ten (10) different project locations in the City of Dallas. The locations include eight (8) storm drainage improvement projects and two (2) pavement reconstruction locations. Four (4) of the storm drainage projects involve water and/or wastewater main replacement. The storm drainage improvement projects include installation of mains of varying diameters ranging from an 18-inch to 72-inch reinforced concrete pipe and 7-foot by 5-foot reinforced box culvert. Water main replacement includes installation of 6-inch to 8-inch diameter polyvinyl chloride pipes. Wastewater main replacement includes installation of 8-inch to 15-inch diameter polyvinyl chloride pipes. Detailed project location and information can be found in the contract specifications. Plans and Specifications for this project will be uploaded no later than Friday, April 18, 2025.