Specifications include, but are not limited to: The scope of work includes replacement of natural gas generators at Tice Elementary School, North Shore Middle School, and Havard Elementary School. Along with the generator replacement we will be splitting the life safety loads and stand by loads to 2 automatic transfer switches to meet current code. 1. Full school operations will be conducted at the school during the normal school year. During the summer vacation, limited school operations will be conducted. 2. The Contractor shall not perform any work during the week of the STAAR and/or EOC testing. Refer to the attached schedule. 3. When school is in session, if the Contractor is going to work during time periods listed below, then the Contractor will include in its Base Proposal the cost of a GPISD employee at the rate of $50.00 per hour to operate the security system and provide access to the facility. a. Prior to 7:00 AM, after 11:00 PM. b. Weekends - refer to attached schedule. c. Holidays - refer to attached schedule 4. The Contractor shall recognize the critical need for safety of all persons involved in the school program, and the need to conduct construction operations in such a way as to minimize disruption of school program operation. Contractor understands that it is the obligation of the Contractor to protect the Work, materials and equipment from vandalism and theft, and that it cannot rely on school security personnel to perform this function.