Specifications include, but are not limited to:ASBESTOS WORKER/HEAT & FROST INSULATOR (Duct, Pipe and Mechanical System Insulation) $ 22.63 11.90 BOIL0074-003 01/01/2014 BOILERMAKER $ 23.14 21.55 CARP0551-008 04/01/2015 CARPENTER (Excludes Acoustical Ceiling Installation, Drywall Hanging, Form Work and Metal Stud Installation) $ 22.50 8.33 ELEC0716-005 09/01/2014 ELECTRICIAN (Excludes Low Voltage Wiring and Installation of Alarms) $ 29.15 8.74 ELEV0031-003 01/01/2015 ELEVATOR MECHANIC $ 38.52 28.385 FOOTNOTES: A. 6% under 5 years based on regular hourly rate for all hours worked. 8% over 5 years based on regular hourly rate for all hours worked. New Year's Day; Memorial Day; Independence Day; Labor Day; Thanksgiving Day; Friday after Thanksgiving Day; Christmas Day; and Veterans Day. ENGI0450-002 04/01/2014 POWER EQUIPMENT OPERATOR