Specifications include, but are not limited to: The Project consists of interior renovations of the existing toilet facilities and expansion of new toilet facilities. tems noted NIC (Not in Contract) will be supplied and installed by Owner before Substantial Completion. Some items include: 1. Movable cabinets. 2. Furnishings. 3. Small equipment. 4. Communications and data cabling and systems. 5. Security systems. 6. I.T. and networking systems. A. Construction Operations: Limited to areas noted on Drawings. 1. Locate and conduct construction activities in ways that will limit disturbance to site. B. Arrange use of site and premises to allow: 1. Owner occupancy. 2. Work by Owner. C. Provide access to and from site as required by law and by Owner: 1. Emergency Building Exits During Construction: Keep all exits required by code open during construction period; provide temporary exit signs if exit routes are temporarily altered. 2. Do not obstruct roadways, sidewalks, or other public ways without permit.