Specifications include, but are not limited to: • Providing a full-time superintendent • Providing a schedule outlining the beginning and end of work at every restroom • Mobilization and demobilization of equipment and crew • Cleaning, painting and patching exterior surfaces (Appendix II) • Cleaning and patching of interior concrete floors (power washing, acid cleaner, removal of lifted paint, etc. as necessary) • Painting of all interior surfaces, one primer coat and two coats of paint (including vents, window ridges, metal frames, and partitions, except flooring) • Painting of exterior metal doors • Removing and replacing all specified amenities. (Appendix I) • Capping all electrical outlets inside the restrooms • Installation of a heating system at four of the restrooms (Mackenzie, Buddy Holly Recreation Area, McAlister, and Mae Simmons) • Discussing with the City additional repairs deemed necessary that might not have been noted at the time of writing the scope