Demolition and Preparation: a. Remove and dispose of R-panel Metal roofing system, metal trim, and associated roofing materials. b. Assess and document the condition of fascia boards, rafters, soffits, vents, roof jacks, and decking. c. Remove and replace all deteriorated or damaged components as necessary. d. Remove inactive equipment to include satellite dishes to be identified by TDCJ Personnel. Installation of New Roofing System: a. Install new R-panel Metal roof with appropriate ridge cap per manufacturer installation instructions. b. Apply new synthetic underlayment per manufacturer specifications. c. Install new metal trim and flashings as required (colors to be approved by TDCJ Personnel). d. Install and seal all new necessary roof vents, roof jacks, and flashing. e. Ensure proper fastening and alignment of roofing materials per code requirements as well as manufacturer instructions. f. Install rain diverters over front and back doors where applicable V. Structural Repairs and Painting: a. Repair or replace all fascia and soffit with Hardie fiber cement fascia and soffit as needed. b. Identify and remove damaged section of gable siding and replace with matching Hardie fiber cement siding. c. Ensure all new wood components are sealed and painted to match existing.