Amendment 0003:
The purpose of this amendment is to include extra equipment information for the boiler system in the attachments.
NEW ATTACHMENT:
Attachment 6 - Extra Equipment Information
CS: SrA Jamie Cutright
CO: Emily Rodriguez
----------------------------------------------------------------------------------------------------------------
Amendment 0002:
The purpose of this amendement is to extend the response due date by six (6) days from Friday 29 August at 1:00 PM CDT to Thursday 4 September at 1:00 PM CDT.
CS: SrA Jamie Cutright
CO: Emily Rodriguez
----------------------------------------------------------------------------------------------------------------
Amendment 0001:
This purpose of this amendment is to remove the clause "52.229-11 Tax on Certain Foreign Procurements - Notice and Representation" as its not applicable, update the salient characteristics, incorporate revised SOW, add Q&A, and Room Drawings. See additional attachments for all information.
CS: SrA Jamie Cutright
CO: Emily Rodriguez
----------------------------------------------------------------------------------------------------------------
This requirement is being solicited as a 100% Total Small Business set aside. The NAICS code is 332410 Power Boiler and Heat Exchanger Manufacturing, size standard is 750 employees. PSC 4410. This is a Brand Name or Equal requirement for a replacement boiler. Refer to salient characteristics and technical criteria listed in the attached RFQ.
PROJECT OVERVIEW. The purpose of this project is to replace the existing gas-fired boiler system in Building 575 at JBSA-Randolph, TX, with a new, energy-efficient, and code-compliant system to meet the facility's long-term heating requirements. The Statement of Work (SOW) outlines the requirements for the contractor to furnish all supervision, labor, materials, tools, equipment, transportation, incidentals, and quality assurance necessary for the removal, disposal, and replacement of the existing system and its associated components.
Refer to attached RFQ and SOW for information regarding this requirement. Please provide quote to POCs listed in the RFQ.
Questions/Concerns: All questions/concerns must be submitted in writing by email no later than Monday, 25 August 2025 at 10:00 am CDT. Responses to questions will be posted by the Government on the ebuy.gsa.gov website, as received. Questions submitted after this date/time will not be considered.
ATTACHMENTS:
1. RFQ
2. SOW
3. PHOTOS