The Government conducting MARKET RESEARCH ONLY and attaining information to identify contractors that are able to provide all items and the cost associated to acquire these specific items/services IAW the Draft SOW. Please fill out and submit the attached Request for Information and return via email to the listed POC's. Refer to the attached documents for reference.
PROJECT OVERVIEW. The purpose of this project is to replace the existing gas-fired boiler system in Building 575 at JBSA-Randolph, TX, with a new, energy-efficient, and code-compliant system to meet the facility's long-term heating requirements. The Statement of Work (SOW) outlines the requirements for the contractor to furnish all supervision, labor, materials, tools, equipment, transportation, incidentals, and quality assurance necessary for the removal, disposal, and replacement of the existing system and its associated components.
ATTACHMENTS:
1. Request for Information
2. DRAFT SOW
3. SALIENT CHARACTERISTICS
4. PHOTOS
5. Drawings