This project will include all construction, labor, materials, administration, and associated activities required for the replacement of site paving at the Sandy Lake Service Center (SLSC) site and replacement of a parking lot at the McInnish Sports Complex (MSC). At the Sandy Lake Service Center (SLSC), the project includes the removal and disposal of existing asphalt and concrete pavement, and replacement with 6-inch (8,000 SY) and 7-inch (2,000 SY) reinforced concrete pavement. The project also includes the removal and disposal of an existing 1,000-gallon oil/water separator, and replacement with one having a 3,000-gallon capacity. The project will also include relocating an existing fire hydrant and construction of a water load stand to fill water trucks. At the McInnish Sports Complex (MSC) Parking Lot, the project includes the removal and disposal of existing asphalt and concrete pavement, and replacement with 6- inch (7,000 SY) reinforced concrete pavement. Other minor work includes barricades and traffic control; construction of driveways and barrier-free ramps; and, installation of pavement markings, wheel stops, topsoil, and sod.