A. Protect items designated for preservation from abuse, marring or damage during construction operations. B. Maintain access and drainage continuously for duration of the project. C. Remove structures, abandoned utility lines and related obstructions to a depth of 2 feet below the finished grade. D. Collect tires, batteries, paint cans, oil cans and related debris items on the right-of-way in a location approved by the Engineer, for disposal by others. E. When Work is finished, remove existing construction signs and reinstall in an approved location when directed by the Engineer. F. Remove structures, outfall pipes, drainage facilities and other items that may interfere with the construction work or as designated on the Plans. G. Maintain all-weather access to adjacent facilities that have driveways. H. Establish and maintain access to the site. I. Clean up the site. J. Install, remove, relocate, replace and reinstall fences, barricades or barriers required to secure the site. K. Secure the site as necessary to perform the Work...