17A: Bore Under Concrete / Sprinkler System • Install approximately 400-500 Linear Feet of 4inche SDR PVC Pipe • Sleeve caps with a height of 4 inches 1. Sprinkler System Components 1a. Please see Exhibit A for details regarding current location of sprinkler heads/sprinkler system. All components are to be replaced with new hardware. Note all sprinkler components in RFP response that will be installed for this project. 17B: Landscaping 1. Inside Fencing / Parking Area: Soil and Prep 1a. Dig out 3–4 inches of soil and roots (reuse some soil; haul off excess) 1b. Install landscape fabric as barrier 1c. Install crushed granite along fence line 1d. Compact granite in 2 inches level 2. New Grass Areas 2a. Spray and kill all existing grass/weeds (Hilbig Rd entrance, Criminal Justice Dr., front sections of building) 2b. Remove and haul off all dead grass 2c. Grade and level soil; dig out around fence line 2d. Treat soil with fertilizer 2e. Install approximately 35 pallets of new grass 3. Landscaping Areas 3a. Front Sign (Hilbig Rd.) 3b. Front Entry Sign (parking lot) 3c. Criminal Justice Dr. (Live Oaks) 3d. 3 large square beds (front entry) 3e. Right front of building 3f. Left front of building...