1. Entrance to the Gym: Open a double solid door entrance in the gym main access with magnetic locking system. Move the access card reader and gym sign. Contractor will be responsible to move the alarm monitor and all electrical switches and outlets. Contractor may have to move water pipes. 2. Removal of walls: Remove 3 cinderblock walls from the office (boxing room) and a closet wall with accordion doors. This will open the weight room and the men’s locker room. Relocate 2 light switches to other surrounding cinderblock wall. All wiring must be installed inside cinderblock walls. Remove electrical outlets from the cinderblock walls that are going to be eliminated in compliance with the City of Laredo Code. All electrical work must comply with the City of Laredo Code. Contractor to advise Police and Engineering Department if any of the walls are load bearing walls prior to removal. 3. Close wall between men’s locker room and men’s shower room. Construct a block wall to close out the entrance between the men’s locker room and the men’s shower. Remove flooring and wall tile and replace with new ceramic flooring and wall tile in all the men’s shower room. (Will match men’s changing room and bathroom). Material allowance $5.00 per square foot. Remove flooring and wall tile and replace with new ceramic flooring and wall tile in all the men’s gym bathroom. (Will match men’s changing room and shower room). Material allowance $5.00 per square foot. Replace men’s bathroom countertop with quarkz (White). Material allowance $45 per square foot. Replace men’s bathroom sinks, facets, urinals, toilets and tissue holders. Replace men’s bathroom toilets/urinal privacy walls and entrance doorways with locks. Construct a 36” doorway from the men’s bathroom and into the sauna. This will be the new entrance to the men’s shower. Purchase/install solid door. Purchase/Install a solid 36” door for the entrance.