Specifications include, but are not limited to: As part of the South Lake Water Treatment Plant (SLWTP), Pedernales Electric Coop (PEC) is extending a new three-phase feeder down Lakeway Drive. At the same time, City of Georgetown Electric will be taking the opportunity to add additional conduits to the trench to convert the existing overhead circuits to underground. This bid is strictly for the civil work associated with the project. The project consists of furnishing, installing and providing all labor and materials required for civil construction along Lakeway Drive between Airport Road and Northwest Blvd. The Bids should take into consideration traffic control, tree removal, fence removal and replacement, landscape replacement, etc., and any communication conflicts that arise during the installation and other miscellaneous items.