Scope of work shall include, but not be limited to the supply and installation of the following; - Fencing materials and components. - Concrete footing/foundations for fencing & gates. - Gates, gate operators and all components for a complete functioning system. - Pedestals for card access control, Loops for gate operations. Contractor is to coordinate with LISD IT/Access control for integration into LISD Access Control system. - All electrical (materials, labor, and equipment) to power gates. Contractor shall provide all necessary electrical materials and devices to connect power to gate operators, and size accordingly. - Conduits supplied and installed for low voltage connections to gates. - All required boring, saw cutting, trenching required for scope of work. - All fabrication of fencing and gate components required to make a complete fencing system. - Demolition of existing fencing and gates as required for a complete scope of work.