1. General Conditions 1.1 Payment, Performance & Maintenance Bonds (each 100% of the contract amount. No markup will be permitted) 1 LS $ - 1.2 SWPP (Complete and in-place including NOI, NOT, maintenance and removal upon completion) 1 LS $ - 1.3 60 Day Landscape Maintenance 1 LS $ - 1.4 General Requirements 1 LS General Items Subtotal $ - 2. Demolition, Grading, Drainage & Utility Items 2.1 Site Demolition and Earthwork 1 LS $ - 2.2 Removal of 36" RCP 8 LF $ - 2.3 Berm and Site Grading 1 LS $ - 2.4 Ditch B Modifications & Hydromulching 1 LS $ - 2.5 Detention Pond Modifications & Hydrodmulching 1 LS $ - 2.6 (2) 24" RCP 22' Length 44 LF $ - 2.7 HDPE Perforated Storm Field Drain System 376 LF $ - 2.8 Trench Safety System 1 LS $ - Demolition, Grading, Drainage, & Utility Items Subtotal $ - 3. Site Electrical Items 3.1 Electrical Service (complete and operational) 1 LS $ - Site Electrical Items Subtotal $ - 4. Hardscape Items 4.1 Concrete Paving 6,013 SF $ - 4.2 Warning Track behind backstop 4,718 SF $ - 4.3 Elevated Score Table 1 EA 4.4 ADA Bleachers with guardrails and handrails 2 EA $ - 4.5 Hanging Cantilever Hip Shade 2 EA $ - 4.6 36" HT CMU Backstop 200 LF $ - 4.7 40' HT Backstop Field Netting 199 LF $ -