Provide all labor, materials, equipment, tools, permitting, testing, and documentation necessary for the construction of a new underground fiber optic cable pathway and the installation of fiber optic cable. Pathway Construction: ○ Furnish and install approximately 25,000 linear feet of continuous underground conduit pathway. ○ Conduit: Install two (2) HDPE conduits, 2.0-inches, SDR 11. Conduit color shall be Orange. Included tracer wire will be 12 AWG copper clad steel within the conduit path or directly buried above it. Conduits can also include inner ducts if it is determined that it would be beneficial for future growth. ○ Installation Method: Primarily directional boring is preferred to minimize surface disruption. Minimum depth will be 36 inches minimum or deeper as needed. When crossing roads the boring depth should be no less than 48” and 60” across except where permit authority requires otherwise or directed in writing.