20.1 Successful bidder shall be required to provide the necessary manpower to drive, park, and have end dump trucks loaded at Jefferson and El Pico Water Plant. 20.2 Loading of dry sludge into dump trucks will be provided by city personnel. 20.3 Successful bidder shall be required to provide end dump truck volume capacity on all manifests and provide proof of volume capacity if necessary. Capacity shall be measured in cubic yards. 20.4 Materials needed to load (plastic liner), transport, and dispose of the sludge hauled, is the sole responsibility of the bidder. Contractor will couple and transport loaded end dump trailers. 20.5 Loading of trucks will take place between 7:00 AM and 5:00 PM. Monday-Friday. In the event of a special sludge loading tasks modification will be required in order to satisfy unscheduled accumulated sludge hauling. 20.6 Successful bidder will be required to use a city approved sludge transporter manifest form for every load. Copy of manifest forms shall be submitted to the Water Treatment Plant Office on a daily basis. 20.7 All transported loads will have to comply with Texas Department of Transportation rules and regulations relation to weight limits. 20.8 Successful bidder must follow safety rules and policies when accessing and on the plant's facility grounds. in 20.9 Quantities listed are approximate quantities and the City of Laredo may increase or decrease the number of loads as it deems necessary. The City of Laredo reserves the right to increase the quantities by an additional 5,000 cubic yards upon mutual agreement between the City of Laredo and the successful bidder.