A. The contract of this work shall include furnishing and installation of completely operable and tested mechanical systems necessary and incidental to the complete construction, as indicated on the Drawings and generally specified in Divisions 22 and 23 of the Specifications, of list project here. B. Also included are sales tax, layout and cleanup, all necessary equipment, labor, inspections and approvals, and responsibility for receiving of equipment, erection and startup. C. Include all equipment and hookup responsible for necessary temporary water; see Section 01 50 00. D. Include all interlock and control wiring not shown on the electrical plans. A. Contractor shall provide all labor, materials, equipment, permits, supervision and other items noted in contract General Conditions, necessary to yield completely operable and tested systems as shown on the plans and specified herein. The work includes, but is not limited to, the following areas: 1. Selective Demolition of existing electrical systems as shown on the drawings and as specified. 2. Complete lighting and power systems as indicated. 3. Lighting fixtures and mounts as indicated. 4. Connection to and grounding of plumbing, heating, and ventilating equipment where required. 5. Devices, fixtures, materials, panels, as specified, and all other incidentals to provide a complete electrical job. 6. Communications raceway, sleeves, cable tray, and equipment boards. 7. Division 28 electronic safety and security systems as specified...