Specifications include, but are not limited to: Architectural A2 Renovate and expand administration and provide secure front vestibule A3 Provide new/additional acoustical treatment at gyms A4 Remove educational casework in all classrooms. Repair walls to achieve consistent smooth surfaces, repaint, and install new casework as per DISD Ed Specs. A5 Remove and replace ACT ceilings with new acoustical lay-in ceiling tile and grid throughout facility. A6 Replace carpet/vinyl composite tile (VCT) and base throughout facility, excluding corridors, auditorium, and athletic areas. A7 Replace vinyl composite tile (VCT) flooring and base in all corridors A8 Remove existing chalkboards, markerboards, and tackboards in every classroom. Repair walls to achieve consistent smooth surfaces, repaint, and install new markerboards and tackboards with integral frames and pen trays. A9 Repair all interior walls to achieve a smooth, consistent finish surface. Prime and repaint. Protect existing lockers to remain. A10 Provide new room signs at each classroom and office, and way-finding signage at 5 corridors A11 Provide new digital marquee sign A12 Provide new way-finding site signage, average one per driveway and parking area. A14 Replace gym wall padding, backboards, goals & supports Building Envelope / Roofing B1 Replace exterior waterproofing / sealant joints at all doors and windows B2 Pressure-wash and repaint all painted exterior walls, doors, and soffits B3 Construct new front entry canopy. Civil / Landscape C1 New Landscaping C2 Add drains to the area between the building and the perimeter sidewalks; connect to existing storm sewer C3 Regrade area between building wings to improve drainage C4 Replace all concrete sidewalks