AMENDMENT 0001 - CHANGE TO PERIOD OF PERFORMANCE.
Contractor shall provide and install through purchase, delivery, and installation - new systems furniture, as described in this PWS, as shown on the Design Intent Drawings (Appendix A), and as described in the Furniture Installation and General Requirements (Appendix B). Work shall occur throughout various lobby, administrative and office areas of Data Center San Antonio.
Furniture installation includes electrical and communication cabling connections. Furniture installation will render the spaces operational to fulfill mission requirements.
Accessing Protected Proposal Documents:
The Access Request Link is located below Attachments/Links header.
If you cannot request RFP HC102825R0040 protected document access:
-Are you logged into SAM?
-Are you a registered SAM Point of Contact within your organization?
-Is your organization represented by NAICS 337214?
-Is your organization an SBA certified Small Business?
RFP HC102825R0040 issuing office has limited to zero assistance ability with SAM registrations. Please visit https://sam.gov/help for SAM registration support.
Allow up to 5 days before attempting to access controlled documents for recently updated SAM registrations. Allow at least 2 weeks before attempting to access controlled documents for new SAM registrations.