All correspondence must be made through the Vendor Portal. Specifications include, but are not limited to: Miscellaneous Materials and Services Gaskets used for hydrotest may be used for shipping, but one additional set of each must be supplied for installation. Supplier must include one spare set of gaskets and 10 percent spare bolting for all blinded flanges on nozzles and manways; these do not include the ones for installation.; The tank design shall include lifting, grounding lugs, and tailing lug (when specified on the data sheet) by the Supplier as part of the base price in accordance with DM-2004A & DM-2004B. Purchaser will confirm with the Supplier the handling and requirement of tank platform clips and pipe support clips at the time of purchase order placement