This notice is for planning purposes only and shall not be considered an invitation for bid, request for quotation, request for proposal, or as an obligation of the government to acquire any products or services. Responses to this notice will be used for informational purposes only. No entitlement to payment of direct or indirect costs from the government will arise as a result from a response to this announcement. No contract will be awarded from this notice. The information requested in this notice will be used to determine if there are sufficient socioeconomic small business concerns that are capable of performing the work described for the requirement. The Department of Veterans Affairs, Veterans Health Administration, Network Contracting Office (NCO) 17 is seeking sources for the following procurement: will support voice recognition of multiple accents and dialects, provide compatibility with the current VA laboratory software VISTA, and VA future electronic health record Cerner, and can be integrated with Nuances Dragon Medical. INTRODUCTION AND SCOPE OF WORK: Introduction: VA North Texas Health Care System (VANTHCS) Pathology and Laboratory Medicine Service (P&LMS) would like to purchase a pathology dictation system that will support voice recognition of multiple accents and dialects and provide compatibility with the current VA laboratory software VISTA, and VA future electronic health record Cerner, and can be integrated with Nuances Dragon Medical. The software will support the workflow of the Anatomic Pathology Department and will require software maintenance and support during regular working hours. The hardware requires warranty coverage in case of failure. Background: VANTHCS Dallas currently uses Nuances Winscribe for pathologists to dictate necessary language for specimens, then have transcriptionist transcribe necessary dictations at different stages throughout the workflow until the pathologist signs out the case. Scope of Work: The Contractor shall provide, transport, install, and test all listed equipment. All products must meet all salient characteristics defined in this section. The Contractor is responsible for any missing parts and components not included in the order to carry out installation. All equipment and installation must meet manufacturers and VA specifications. The Contractor shall furnish any missing parts and components not included in the order to carry out installation. Training of staff in the operation and maintenance of the equipment shall be provided by the Contractor. Salient Characteristics Digital Dictation System Seven (7) hands-free dictation systems to be used at two grossing stations, four transcriptionist desks and the autopsy suite with the ability to start, stop, rewind, or end a case dictation hands free. The system should be a text-to-speech system that integrates Nuances Dragon Medical software into the workflow. This includes necessary wireless microphones, foot controls, and software for each station. Nine (9) dictation systems to be used in pathologist s offices with the ability to start, stop, rewind, or end a case dictation hands free. The system should be a text-to-speech system that integrates Nuances Dragon Medical software into the workflow. This includes necessary microphones, foot controls, and software for each station. Management access for one supervisor station. The management software or access should provide the ability to assess current jobs, move jobs, and run productivity reports. Software should be able to categorize dictations for defined workflow. Software should have the ability to track dictation authors and transcriptionist/ editors. All software must be VA compliant and able to operate on a virtual server or in the cloud. Software must be able to progressively learn different dialects to improve dictation. Software must meet all VA HIPPAA and IT security requirements. Customer support and maintenance will be available Monday-Friday (0800-1700) and Saturday and Sunday (for urgent issues only). On-site training for all users of the system at completion of installation at no cost to the Government. On-site training for one member of the BioMed Service team at no cost to the Government. REQUIREMENTS Type of Contract: Firm-Fixed-Price (for configuration and installation of hardware and software components. General Requirements: The contractor will participate in a project kickoff meeting typically within one (1) month of the contract being awarded that will be scheduled by the Contracting Officer, and follow-on meetings as needed throughout the planning for and installation of the system components. Prior Installation: The contractor will assign a Project Manager (PM) prior to installation, who will work with VANTHCS P&LMS team to address any issues (after -hour installation, facility specifics, scheduling, etc.). The PM will also confirm or adjust configuration requirements. Prior to installation, PM will confirm solution deployment and coordinate installation with VANTHCS P&LMS team. The software will be loaded remotely onto local servers. Technician will verify the system is working properly. Installation: All equipment shall be installed by the contractor or contractor s representative unless otherwise noted above. Install all equipment to manufacturer s specifications maintaining Federal, State, and Local safety standards. Exact installation date(s) will be coordinated with COR. The technician will install and test hardware and software. Installation will be carried out in a manner and during which times as to minimize disruption to patient care and/or P&LMS workflow. If there is an operational conflict with installation, night or weekend installation may be required. Government will provide a 72-hour notice of change of installation hours. Training: On-site training at the completion of installation at no cost to the Government for all users of the solution, and training of Biomedical personnel in the care and maintenance of the solution. The contractor shall coordinate all deliveries, staging areas, installation, and parking arrangements with COR. The Contactor shall remove all related shipping debris and clean up any construction associated with delivery and installation of specified items. Contractor shall remove all packaging from VANTHCS premises. The contractor shall be responsible for any damage to the building that occurs due to Contractor error or neglect. During operation: The Project Manager team will continue to work with local team for two (2) to three (3) weeks after installation to make sure local team is well versed and there are no unforeseen issues. The contractor will provide maintenance of the system components to maintain the system in a fully operational status. Period of Performance: Installation of all system components is anticipated to occur approximately 90 days of contract award. Maintenance of system software components must be provided during the life of the contract. REFERENCES: None. DELIVERABLES: The contractor will remotely install the required software; the installation will include all necessary configurations to all use of the system as intended. The Contactor shall deliver all equipment to VANTHCS at 4500 S. Lancaster Rd, Dallas, TX 75126, Bldg. 44. The contractor will provide onsite or virtual training to P&LMS staff on operation of the system. The contractor will provide a maintenance contract for software as indicated above that will be managed by Biomedical Engineering. QUALITY ASSURANCE SURVEILLANCE PROGRAM (QASP): The Contracting Officers Representative (COR) and Biomedical Engineering will ensure the contractor satisfactorily completes installation of all system software and that the system is fully functional; the COR and Biomedical Engineering will also ensure that contractor abides by requirements of the maintenance contact for the software. The COR will ensure the contractor provides the required training to P&LMS staff. SECURITY CONSIDERATIONS: The C&A requirements do not apply, and that a Security Accreditation Package is not required. Contractor staff may require access to VANTHCS P&LMS under escort/supervision of P&LMS staff during installation of the system. Contract staff will require supervised access to the Voiceover Pro server for software installation but will not require access to patient information. The QMATIC server does not contain any patient information. Contractor staff performing any future repair or replacement of software under the maintenance agreement may require access to VANTHCS P&LMS under escort/supervision or supervised access to the QMATIC server; however, will not need access to patient information. The COR and the Contractor will assure that: No other information except what is in this contract will be shared with the contractor in any follow up communication. None of the information in this contract includes Protected Health Information (PHI) or Individually Identifiable Information (III). NO VA DATA OF ANY TYPE SHALL BE TRANSFERRED FROM THE VA. The vendor will not have remote access to complete the repair(s) and preventive maintenance. ALL DATA AND ELECTRONIC MEDIA WILL NOT LEAVE THE VA. All hardrives will not leave the VA. For more information, please contact the Contracting Officer s Representative (COR): Name: William J. Scott Title: Assistant Laboratory Manager, Pathology & Laboratory Medicine Service VA North Texas Health Care System 4500 South Lancaster Rd Dallas, TX 75216 Phone: (214) 857-3369 VA Sensitive Information Clause If access to sensitive information involved with this contract. Tier 1 investigation is needed. SAC is required for 6mo or less. NACI is required for over 6mo to 5 years. 1. GENERAL Contractors, contractor personnel, subcontractors, and subcontractor personnel shall be subject to the same Federal laws, regulations, standards, and VA Directives and Handbooks as VA and VA personnel regarding information and information system security. 2. ACCESS TO VA INFORMATION AND VA INFORMATION SYSTEMS a. A contractor/subcontractor shall request logical (technical) or physical access to VA information and VA information systems for their employees, subcontractors, and affiliates only to the extent necessary to perform the services specified in the contract, agreement, or task order. b. All contractors, subcontractors, and third-party servicers and associates working with VA information is subject to the same investigative requirements as those of VA appointees or employees who have access to the same types of information. The level and process of background security investigations for contractors must be in accordance with VA Directive and Handbook 0710, Personnel Suitability and Security Program. The Office for Operations, Security, and Preparedness is responsible for these policies and procedures. c. Contract personnel who require access to national security programs must have a valid security clearance. National Industrial Security Program (NISP) was established by Executive Order 12829 to ensure that cleared U.S. defense industry contract personnel safeguard the classified information in their possession while performing work on contracts, programs, bids, or research and development efforts. The Department of Veterans Affairs does not have a Memorandum of Agreement with Defense Security Service (DSS). Verification of a Security Clearance must be processed through the Special Security Officer located in the Planning and National Security Service within the Office of Operations, Security, and Preparedness. d. Custom software development and outsourced operations must be located in the U.S. to the maximum extent practical. If such services are proposed to be performed abroad and are not disallowed by other VA policy or mandates, the contractor / subcontractor must state where all non-U.S. services are provided and detail a security plan, deemed to be acceptable by VA, specifically to address mitigation of the resulting problems of communication, control, data protection, and so forth. Location within the U.S. may be an evaluation factor. e. The contractor or subcontractor must notify the Contracting Officer immediately when an employee working on a VA system or with access to VA information is reassigned or leaves the contractor or subcontractor s employ. The Contracting Officer must also be notified immediately by the contractor or subcontractor prior to an unfriendly termination. 3. VA INFORMATION CUSTODIAL LANGUAGE a. Information made available to the contractor or subcontractor by VA for the performance or administration of this contract or information developed by the contractor/subcontractor in performance or administration of the contract shall be used only for those purposes and shall not be used in any other way without the prior written agreement of the VA. This clause expressly limits the contractor/subcontractor's rights to use data as described in Rights in Data - General, FAR 52.227-14(d) (1). b. VA information should not be co-mingled, if possible, with any other data on the contractors/subcontractor s information systems or media storage systems in order to ensure VA requirements related to data protection and media sanitization can be met. If co-mingling must be allowed to meet the requirements of the business need, the contractor must ensure that VA s information is returned to the VA or destroyed in accordance with VA s sanitization requirements. VA reserves the right to conduct on-site inspections of contractor and subcontractor IT resources to ensure data security controls, separation of data and job duties, and destruction/media sanitization procedures are in compliance with VA directive requirements. c. Prior to termination or completion of this contract, contractor/subcontractor must not destroy information received from VA, or gathered/created by the contractor in the course of performing this contract without prior written approval by the VA. Any data destruction done on behalf of VA by a contractor/subcontractor must be done in accordance with National Archives and Records Administration (NARA) requirements as outlined in VA Directive 6300, Records and Information Management and its Handbook 6300.1 Records Management Procedures, applicable VA Records Control Schedules, and VA Handbook 6500.1, Electronic Media Sanitization. Self-certification by the contractor that the data destruction requirements above have been met must be sent to the VA Contracting Officer within 30 days of termination of the contract. d. The contractor/subcontractor must receive, gather, store, back up, maintain, use, disclose and dispose of VA information only in compliance with the terms of the contract and applicable Federal and VA information confidentiality and security laws, regulations and policies. If Federal or VA information confidentiality and security laws, regulations and policies become applicable to the VA information or information systems after execution of the contract, or if NIST issues or updates applicable FIPS or Special Publications (SP) after execution of this contract, the parties agree to negotiate in good faith to implement the information confidentiality and security laws, regulations and policies in this contract. e. The contractor/subcontractor shall not make copies of VA information except as authorized and necessary to perform the terms of the agreement or to preserve electronic information stored on contractor/subcontractor electronic storage media for restoration in case any electronic equipment or data used by the contractor / subcontractor needs to be restored to an operating state. If copies are made for restoration purposes, after the restoration is complete, the copies must be appropriately destroyed. f. If VA determines that the contractor has violated any of the information confidentiality, privacy, and security provisions of the contract, it shall be sufficient grounds for VA to withhold payment to the contractor or third party or terminate the contract for default or terminate for cause under Federal Acquisition Regulation (FAR) part 12. g. If a VHA contract is terminated for cause, the associated BAA must also be terminated and appropriate actions taken in accordance with VHA Handbook 1600.01, Business Associate Agreements. Absent an agreement to use or disclose protected health information, there is no business associate relationship. h. The contractor/subcontractor must store, transport, or transmit VA sensitive information in an encrypted form, using VA-approved encryption tools that are, at a minimum, FIPS 140-2 validated. i. The contractor/subcontractor s firewall and Web services security controls, if applicable, shall meet or exceed VA s minimum requirements. VA Configuration Guidelines are available upon request. j. Except for uses and disclosures of VA information authorized by this contract for performance of the contract, the contractor/subcontractor may use and disclose VA information only in two other situations: (i) in response to a qualifying order of a court of competent jurisdiction, or (ii) with VA s prior written approval. The contractor / subcontractor must refer all requests for, demands for production of, or inquiries about, VA information and information systems to the VA contracting officer for response. k. Notwithstanding the provision above, the contractor/subcontractor shall not release VA records protected by Title 38 U.S.C. 5705, confidentiality of medical quality assurance records and/or Title 38 U.S.C. 7332, confidentiality of certain health records pertaining to drug addiction, sickle cell anemia, alcoholism or alcohol abuse, or infection with human immunodeficiency virus. If the contractor/subcontractor is in receipt of a court order or other requests for the above mentioned information, that contractor/subcontractor shall immediately refer such court orders or other requests to the VA contracting officer for response. l. For service that involves the storage, generating, transmitting, or exchanging of VA sensitive information but does not require C&A or an MOU-ISA for system interconnection, the contractor/subcontractor must complete a Contractor Security Control Assessment (CSCA) on a yearly basis and provide it to the COTR. 4. INFORMATION SYSTEM DESIGN AND DEVELOPMENT a. Information systems that are designed or developed for or on behalf of VA at non-VA facilities shall comply with all VA directives developed in accordance with FISMA, HIPAA, NIST, and related VA security and privacy control requirements for Federal information systems. This includes standards for the protection of electronic PHI, outlined in 45 C.F.R. Part 164, Subpart C, information and system security categorization level designations in accordance with FIPS 199 and FIPS 200 with implementation of all baseline security controls commensurate with the FIPS 199 system security categorization (reference Appendix D of VA Impact Assessment (PIA) must be completed, provided to the COTR, and approved by the VA Privacy Service in accordance with Directive 6507, VA Privacy Impact Assessment. b. The contractor/subcontractor shall certify to the COTR that applications are fully functional and operate correctly as intended on systems using the VA Federal Desktop Core Configuration (FDCC), and the common security configuration guidelines provided by NIST or the VA. This includes Internet Explorer 7 configured to operate on Windows XP and Vista (in Protected Mode on Vista) and future versions, as required. c. The standard installation, operation, maintenance, updating, and patching of software shall not alter the configuration settings from the VA approved and FDCC configuration. Information technology staff must also use the Windows Installer Service for installation to the default program files directory and silently install and uninstall. d. Applications designed for normal end users shall run in the standard user context without elevated system administration privileges. e. The security controls must be designed, developed, approved by VA, and implemented in accordance with the provisions of VA security system development life cycle as outlined in NIST Special Publication 800-37, Guide for Applying the Risk Management Framework to Federal Information Systems, VA Handbook 6500, Information Security Program and VA Handbook 6500.5, Incorporating Security and Privacy in System Development Lifecycle. f. The contractor/subcontractor is required to design, develop, or operate a System of Records Notice (SOR) on individuals to accomplish an agency function subject to the Privacy Act of 1974, (as amended), Public Law 93-579, December 31, 1974 (5 U.S.C. 552a) and applicable agency regulations. Violation of the Privacy Act may involve the imposition of criminal and civil penalties. g. The contractor/subcontractor agrees to: (1) Comply with the Privacy Act of 1974 (the Act) and the agency rules and regulations issued under the Act in the design, development, or operation of any system of records on individuals to accomplish an agency function when the contract specifically identifies: (a) The Systems of Records (SOR); and (b) The design, development, or operation work that the contractor/subcontractor is to perform; (2) Include the Privacy Act notification contained in this contract in every solicitation and resulting subcontract and in every subcontract awarded without a solicitation, when the work statement in the proposed subcontract requires the redesign, development, or operation of a SOR on individuals that is subject to the Privacy Act; and (3) Include this Privacy Act clause, including this subparagraph (3), in all subcontracts awarded under this contract which requires the design, development, or operation of such a SOR. h. In the event of violations of the Act, a civil action may be brought against the agency involved when the violation concerns the design, development, or operation of a SOR on individuals to accomplish an agency function, and criminal penalties may be imposed upon the officers or employees of the agency when the violation concerns the operation of a SOR on individuals to accomplish an agency function. For purposes of the Act, when the contract is for the operation of a SOR on individuals to accomplish an agency function, the contractor/subcontractor is considered to be an employee of the agency. (1) Operation of a System of Records means performance of any of the activities associated with maintaining the SOR, including the collection, use, maintenance, and dissemination of records. (2) Record means any item, collection, or grouping of information about an individual that is maintained by an agency, including, but not limited to, education, financial transactions, medical history, and criminal or employment history and contains the person s name, or identifying number, symbol, or any other identifying particular assigned to the individual, such as a fingerprint or voiceprint, or a photograph. (3) System of Records means a group of any records under the control of any agency from which information is retrieved by the name of the individual or by some identifying number, symbol, or other identifying particular assigned to the individual. i. The vendor shall ensure the security of all procured or developed systems and technologies, including their subcomponents (hereinafter referred to as Systems ), throughout the life of this contract and any extension, warranty, or maintenance periods. This includes, but is not limited to workarounds, patches, hotfixes, upgrades, and any physical components (hereafter referred to as Security Fixes) which may be necessary to fix all security vulnerabilities published or known to the vendor anywhere in the Systems, including Operating Systems and firmware. The vendor shall ensure that Security Fixes shall not negatively impact the Systems. j. The vendor shall notify VA within 24 hours of the discovery or disclosure of successful exploits of the vulnerability which can compromise the security of the Systems including the confidentiality or integrity of its data and operations, or the availability of the system). Such issues shall be remediated as quickly as is practical, but in no event longer than _30_ days. k. When the Security Fixes involve installing third party patches (such as Microsoft OS patches or Adobe Acrobat), the vendor will provide written notice to the VA that the patch has been validated as not affecting the Systems within 10 working days. When the vendor is responsible for operations or maintenance of the Systems, they shall apply the Security Fixes within _10_ days. l. All other vulnerabilities shall be remediated as specified in this paragraph in a timely manner based on risk, but within _60_ days of discovery or disclosure. Exceptions to this paragraph (e.g. for the convenience of VA) shall only be granted with approval of the contracting officer and the VA Assistant Secretary for Office of Information and Technology. 5. INFORMATION SYSTEM HOSTING, OPERATION, MAINTENANCE, OR USE a. For information systems that are hosted, operated, maintained, or used on behalf of VA at non-VA facilities, contractors/subcontractors are fully responsible and accountable for ensuring compliance with all HIPAA, Privacy Act, FISMA, NIST, FIPS, and VA security and privacy directives and handbooks. This includes conducting compliant risk assessments, routine vulnerability scanning, system patching and change management procedures, and the completion of an acceptable contingency plan for each system. The contractor s security control procedures must be equivalent, to those procedures used to secure VA systems. A Privacy Impact Assessment (PIA) must also be provided to the COTR and approved by VA Privacy Service prior to operational approval. All external Internet connections to VA s network involving VA information must be reviewed and approved by VA prior to implementation. b. Adequate security controls for collecting, processing, transmitting, and storing of Personally Identifiable Information (PII), as determined by the VA Privacy Service, must be in place, tested, and approved by VA prior to hosting, operation, maintenance, or use of the information system, or systems by or on behalf of VA. These security controls are to be assessed and stated within the PIA and if these controls are determined not to be in place, or inadequate, a Plan of Action and Milestones (POA&M) must be submitted and approved prior to the collection of PII. c. Outsourcing (contractor facility, contractor equipment or contractor staff) of systems or network operations, telecommunications services, or other managed services requires certification and accreditation (authorization) (C&A) of the contractor s systems in accordance with VA Handbook 6500.3, Certification and Accreditation and/or the VA OCS Certification Program Office. Government-owned (government facility or government equipment) contractor-operated systems, third party or business partner networks require memorandums of understanding and interconnection agreements (MOU-ISA) which detail what data types are shared, who has access, and the appropriate level of security controls for all systems connected to VA networks. d. The contractor/subcontractor s system must adhere to all FISMA, FIPS, and NIST standards related to the annual FISMA security controls assessment and review and update the PIA. Any deficiencies noted during this assessment must be provided to the VA contracting officer and the ISO for entry into VA s POA&M management process. The contractor/subcontractor must use VA s POA&M process to document planned remedial actions to address any deficiencies in information security policies, procedures, and practices, and the completion of those activities. Security deficiencies must be corrected within the timeframes approved by the government. Contractor/subcontractor procedures are subject to periodic, unannounced assessments by VA officials, including the VA Office of Inspector General. The physical security aspects associated with contractor/subcontractor activities must also be subject to such assessments. If major changes to the system occur that may affect the privacy or security of the data or the system, the C&A of the system may need to be reviewed, retested and re-authorized per VA Handbook 6500.3. This may require reviewing and updating all of the documentation (PIA, System Security Plan, and Contingency Plan). The Certification Program Office can provide guidance on whether a new C&A would be necessary. e. The contractor/subcontractor must conduct an annual self-assessment on all systems and outsourced services as required. Both hard copy and electronic copies of the assessment must be provided to the COTR. The government reserves the right to conduct such an assessment using government personnel or another contractor/subcontractor. The contractor/subcontractor must take appropriate and timely action (this can be specified in the contract) to correct or mitigate any weaknesses discovered during such testing, generally at no additional cost. f. VA prohibits the installation and use of personally-owned or contractor / subcontractor owned equipment or software on VA s network. If non-VA owned equipment must be used to fulfill the requirements of a contract, it must be stated in the service agreement, SOW or contract. All of the security controls required for government furnished equipment (GFE) must be utilized in approved other equipment (OE) and must be funded by the owner of the equipment. All remote systems must be equipped with, and use, a VA-approved antivirus (AV) software and a personal (host-based or enclave based) firewall that is configured with a VA approved configuration. Software must be kept current, including all critical updates and patches. Owners of approved OE are responsible for providing and maintaining the anti-viral software and the firewall on the non-VA owned OE. g. All electronic storage media used on non-VA leased or non-VA owned IT equipment that is used to store, process, or access VA information must be handled in adherence with VA Handbook 6500.1, Electronic Media Sanitization upon: (i) completion or termination of the contract or (ii) disposal or return of the IT equipment by the contractor/subcontractor or any person acting on behalf of the contractor/subcontractor, whichever is earlier. Media (hard drives, optical disks, CDs, back-up tapes, etc.) used by the contractors/subcontractors that contain VA information must be returned to the VA for sanitization or destruction or the contractor/subcontractor must self-certify that the media has been disposed of per 6500.1 requirements. This must be completed within 30 days of termination of the contract. h. Bio-Medical devices and other equipment or systems containing media (hard drives, optical disks, etc.) with VA sensitive information must not be returned to the vendor at the end of lease, for trade-in, or other purposes. The options are: (1) Vendor must accept the system without the drive; (2) VA s initial medical device purchase includes a spare drive which must be installed in place of the original drive at time of turn-in; or (3) VA must reimburse the company for media at a reasonable open market replacement cost at time of purchase. (4) Due to the highly specialized and sometimes proprietary hardware and software associated with medical equipment/systems, if it is not possible for the VA to retain the hard drive, then; (a) The equipment vendor must have an existing BAA if the device being traded in has sensitive information stored on it and hard drive(s) from the system are being returned physically intact; and (b) Any fixed hard drive on the device must be non-destructively sanitized to the greatest extent possible without negatively impacting system operation. Selective clearing down to patient data folder level is recommended using VA approved and validated overwriting technologies/methods/tools. Applicable media sanitization specifications need to be preapproved and described in the purchase order or contract. (c) A statement needs to be signed by the Director (System Owner) that states that the drive could not be removed and that (a) and (b) controls above are in place and completed. The ISO needs to maintain the documentation. 6. SECURITY INCIDENT INVESTIGATION a. The term security incident means an event that has, or could have, resulted in unauthorized access to, loss or damage to VA assets, or sensitive information, or an action that breaches VA security procedures. The contractor/subcontractor shall immediately notify the COTR and simultaneously, the designated ISO and Privacy Officer for the contract of any known or suspected security/privacy incidents, or any unauthorized disclosure of sensitive information, including that contained in system(s) to which the contractor/subcontractor has access. b. To the extent known by the contractor/subcontractor, the contractor/subcontractor s notice to VA shall identify the information involved, the circumstances surrounding the incident (including to whom, how, when, and where the VA information or assets were placed at risk or compromised), and any other information that the contractor / subcontractor considers relevant. c. With respect to unsecured protected health information, the business associate is deemed to have discovered a data breach when the business associate knew or should have known of a breach of such information. Upon discovery, the business associate must notify the covered entity of the breach. Notifications need to be made in accordance with the executed business associate agreement. d. In instances of theft or break-in or other criminal activity, the contractor/subcontractor must concurrently report the incident to the appropriate law enforcement entity (or entities) of jurisdiction, including the VA OIG and Security and Law Enforcement. The contractor, its employees, and its subcontractors and their employees shall cooperate with VA and any law enforcement authority responsible for the investigation and prosecution of any possible criminal law violation(s) associated with any incident. The contractor/subcontractor shall cooperate with VA in any civil litigation to recover VA information, obtain monetary or other compensation from a third party for damages arising from any incident, or obtain injunctive relief against any third party arising from, or related to, the incident. 7. LIQUIDATED DAMAGES FOR DATA BREACH a. Consistent with the requirements of 38 U.S.C. §5725, a contract may require access to sensitive personal information. If so, the contractor is liable to VA for liquidated damages in the event of a data breach or privacy incident involving any SPI the contractor/subcontractor processes or maintains under this contract. b. The contractor/subcontractor shall provide notice to VA of a security incident as set forth in the Security Incident Investigation section above. Upon such notification, VA must secure from a non-Department entity or the VA Office of Inspector General an independent risk analysis of the data breach to determine the level of risk associated with the data breach for the potential misuse of any sensitive personal information involved in the data breach. The term 'data breach' means the loss, theft, or other unauthorized access, or any access other than that incidental to the scope of employment, to data containing sensitive personal information, in electronic or printed form, that results in the potential compromise of the confidentiality or integrity of the data. Contractor shall fully cooperate with the entity performing the risk analysis. Failure to cooperate may be deemed a material breach and grounds for contract termination. c. Each risk analysis shall address all relevant information concerning the data breach, including the following: (1) Nature of the event (loss, theft, unauthorized access); (2) Description of the event, including: (a) Date of occurrence; (b) data elements involved, including any PII, such as full name, social security number, date of birth, home address, account number, disability code; (3) Number of individuals affected or potentially affected; (4) Names of individuals or groups affected or potentially affected; (5) Ease of logical data access to the lost, stolen or improperly accessed data in light of the degree of protection for the data, e.g., unencrypted, plain text; (6) Amount of time the data has been out of VA control; (7) The likelihood that the sensitive personal information will or has been compromised (made accessible to and usable by unauthorized persons); (8) Known misuses of data containing sensitive personal information, if any; (9) Assessment of the potential harm to the affected individuals; (10) Data breach analysis as outlined in 6500.2 Handbook, Management of Security and Privacy Incidents, as appropriate; and (11) Whether credit protection services may assist record subjects in avoiding or mitigating the results of identity theft based on the sensitive personal information that may have been compromised. d. Based on the determinations of the independent risk analysis, the contractor shall be responsible for paying to the VA liquidated damages in the amount of $_37.50_ per affected individual to cover the cost of providing credit protection services to affected individuals consisting of the following: (1) Notification; (2) One year of credit monitoring services consisting of automatic daily monitoring of at least 3 relevant credit bureau reports; (3) Data breach analysis; (4) Fraud resolution services, including writing dispute letters, initiating fraud alerts and credit freezes, to assist affected individuals to bring matters to resolution; (5) One year of identity theft insurance with $20,000.00 coverage at $0 deductible; and (6) Necessary legal expenses the subjects may incur to repair falsified or damaged credit records, histories, or financial affairs. 9. TRAINING a. All contractor employees and subcontractor employees requiring access to VA information and VA information systems shall complete the following before being granted access to VA information and its systems: (1) Sign and acknowledge (either manually or electronically) understanding of and responsibilities for compliance with the Contractor Rules of Behavior, Appendix E relating to access to VA information and information systems; (2) Successfully complete the VA Cyber Security Awareness and Rules of Behavior training and annually complete required security training; (3) Successfully complete the appropriate VA privacy training and annually complete required privacy training; and (4) Successfully complete any additional cyber security or privacy training, as required for VA personnel with equivalent information system access [to be defined by the VA program official and provided to the contracting officer for inclusion in the solicitation document e.g., any role-based information security training required in accordance with NIST Special Publication 800-16, Information Technology Security Training Requirements.] b. The contractor shall provide to the contracting officer and/or the COTR a copy of the training certificates and certification of signing the Contractor Rules of Behavior for each applicable employee within 1 week of the initiation of the contract and annually thereafter, as required. c. Failure to complete the mandatory annual training and sign the Rules of Behavior annually, within the timeframe required, is grounds for suspension or termination of all physical or electronic access privileges and removal from work on the contract until such time as the training and documents are complete. This User Agreement contains rights and authorizations regarding my access to and use of any information assets or resources associated with my performance of services under the contract terms with the Department of Veterans Affairs (VA). This User Agreement covers my access to all VA data whether electronic or hard copy ("Data"), VA information systems and resources ("Systems"), and VA sites ("Sites"). This User Agreement incorporates Rules of Behavior for using VA, and other information systems and resources under the contract. NARA RM Language Clause 1. Contractor shall comply with all applicable records management laws and regulations, as well as National Archives and Records Administration (NARA) records policies, including but not limited to the Federal Records Act (44 U.S.C. chs. 21, 29, 31, 33), NARA regulations at 36 CFR Chapter XII Subchapter B, and those policies associated with the safeguarding of records covered by the Privacy Act of 1974 (5 U.S.C. 552a). These policies include the preservation of all records, regardless of form or characteristics, mode of transmission, or state of completion. 2. In accordance with 36 CFR 1222.32, all data created for Government use and delivered to, or falling under the legal control of, the Government are Federal records subject to the provisions of 44 U.S.C. chapters 21, 29, 31, and 33, the Freedom of Information Act (FOIA) (5 U.S.C. 552), as amended, and the Privacy Act of 1974 (5 U.S.C. 552a), as amended and must be managed and scheduled for disposition only as permitted by statute or regulation. 3. In accordance with 36 CFR 1222.32, Contractor shall maintain all records created for Government use or created in the course of performing the contract and/or delivered to, or under the legal control of the Government and must be managed in accordance with Federal law. Electronic records and associated metadata must be accompanied by sufficient technical documentation to permit understanding and use of the records and data. 4. VA North Texas Health Care System and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Records may not be removed from the legal custody of VA North Texas Health Care System or destroyed except for in accordance with the provisions of the agency records schedules and with the written concurrence of the Head of the Contracting Activity. Willful and unlawful destruction, damage or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701. In the event of any unlawful or accidental removal, defacing, alteration, or destruction of records, Contractor must report to VA North Texas Health Care System. The agency must report promptly to NARA in accordance with 36 CFR 1230. 5. The Contractor shall immediately notify the appropriate Contracting Officer upon discovery of any inadvertent or unauthorized disclosures of information, data, documentary materials, records, or equipment. Disclosure of non-public information is limited to authorized personnel with a need-to-know as described in the [contract vehicle]. The Contractor shall ensure that the appropriate personnel, administrative, technical, and physical safeguards are established to ensure the security and confidentiality of this information, data, documentary material, records and/or equipment is properly protected. The Contractor shall not remove material from Government facilities or systems, or facilities or systems operated or maintained on the Government s behalf, without the express written permission of the Head of the Contracting Activity. When information, data, documentary material, records and/or equipment is no longer required, it shall be returned to VA North Texas Health Care System control, or the Contractor must hold it until otherwise directed. Items returned to the Government shall be hand carried, mailed, emailed, or securely electronically transmitted to the Contracting Officer or address prescribed in the [contract vehicle]. Destruction of records is EXPRESSLY PROHIBITED unless in accordance with Paragraph (4). 6. The Contractor is required to obtain the Contracting Officer's approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under, or relating to, contracts. The Contractor (and any sub-contractor) is required to abide by Government and VA North Texas Health Care System guidance for protecting sensitive, proprietary information, classified, and controlled unclassified information. 7. The Contractor shall only use Government IT equipment for purposes specifically tied to or authorized by the contract and in accordance with VA North Texas Health Care System policy. 8. The Contractor shall not create or maintain any records containing any non-public VA North Texas Health Care System information that are not specifically tied to or authorized by the contract. 9. The Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected from public disclosure by an exemption to the Freedom of Information Act. 10. The VA North Texas Health Care System owns the rights to all data and records produced as part of this contract. All deliverables under the contract are the property of the U.S. Government for which VA North Texas Health Care System shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest. Any Contractor rights in the data or deliverables must be identified as required by FAR 52.227-11 through FAR 52.227-20. 11. Training.  All Contractor employees assigned to this contract who create, work with, or otherwise handle records are required to take VHA-provided records management training, Talent Management System (TMS) Item #10176, Privacy and Information Security, Rules of Behavior. The Contractor is responsible for confirming training has been completed according to agency policies, including initial training and any annual or refresher training. References: 36 CFR Part 1222.32 (b) VA Directive 6500 VA Handbook 6300.1 VHA Directive 6300