1. Installation of a BluBox MBR 4-Zone System Complete Unit (BluBox Model Number 8000-V0- ACIP-UV) 2. Installation of a 24,000-gallon Sludge Holding Tank, bolted steel with access ladder. 3. Installation of Process Piping (PVC/HDPE/ DI as specified) - includes mains, branch connections to process equipment, valves and fittings. 4. Installation of Aeration Piping (as specified) - blower discharge piping to diffusers, isolation valves, silencing. 5. Installation of Power Distribution to Process Equipment (local MCC/Panel provisions, starters, wiring to equipment). 6. Installation of Control Panel(s) and Instrumentation for MBRs, blowers, pumps, and flow metering - PLC and HMI included. 7. Installation of Access walkways, stairs, handrails, ladders, and safety signage for equipment and tanks. 8. Installation of Office / Lab Building - 12 ft x 20 ft modular building, includes restrooms, HVAC,lighting, basic finishes, doors/ windows.